mcpcost

io.github.wyre-technology/scalepad-mcp

ScalePad

Is the ScalePad MCP server down? No. It answered initialize and tools/list in the probe of 2026-11-04.

MCP server for ScalePad — Core, Lifecycle Manager, ControlMap, Backup Radar, and Quoter.

alive probed 2026-11-14 · unchanged since 2026-11-04

381tools
85ktokens in Claude Opus 5.5
42.3 %of Claude's 200k window
34×the median server
579 msto initialize
54 msto list tools
Run it
docker run -i --rm ghcr.io/wyre-technology/scalepad-mcp:v1.0.5 (stdio, probed in a container with the network off)
Host
ghcr.io
Reports itself as
scalepad-mcp 1.0.0
Capabilities
tools
Instructions
none
Of a 1M window
8.5 % of a 1M context window
Count
85k tokens in Claude Opus 5.5, exact, measured 2026-11-04. With the Claude Code prefix mcp__…__ on each tool name: 90k. The o200k_base estimate is 46k. Counted again when the tool definitions change. Method.
Repository
https://github.com/wyre-technology/scalepad-mcp
Website
https://github.com/wyre-technology/scalepad-mcp
Registry
active, updated 2026-08-20 · registry entry

Most expensive tools

The Claude column scales the o200k estimate of each tool by this server's ratio of exact to estimate, 1.84×.

Tool≈ Claude tokenso200k estimateShare of this server
scalepad_quoter_quotes_list9385091 %
scalepad_quoter_contacts_list8294501 %
scalepad_quoter_items_list6303421 %
scalepad_quoter_item_option_values_list5753121 %
scalepad_navigate5563021 %

Compare this server with others, or with the servers that share its tool set.

Same tool set as 1 other server

These registry entries have the same tool names and the same schema sizes.

More servers

Other registry entries on ghcr.io, the ones next to this name; all of them.

Servers that mention scalepad or controlmap or lifecycle.

Badge for the README

mcpcost: alive

The result of the latest probe, the tool count and the token cost. The feed has an entry for every probe that changed them.

Atom feed

A mail when this server changes

Stops answering, comes back, tool set or cost changes. One confirmation mail first, a stop link in every mail.

For the publisher