mcpcost

io.github.rbsoftwaresystems/draftlytic-mcp

draftlytic-mcp

Is the io.github.rbsoftwaresystems/draftlytic-mcp MCP server down? No. It answered initialize and tools/list in the probe of 2026-11-01.

Offline MCP server for planning structured project specs — validate, render, and checklist tools.

alive probed 2026-11-14 · unchanged since 2026-11-01

4tools
1.4ktokens in Claude
0.7 %of Claude's 200k window
0.6×the median server
237 msto initialize
33 msto list tools
Run it
npx -y draftlytic-mcp@0.4.1 (stdio, probed in a container with the network off)
Host
npmjs.com
Reports itself as
draftlytic-mcp 0.4.1
Capabilities
prompts, tools
Instructions
1 124 characters
Of a 1M window
0.1 % of a 1M context window
Count
1.4k tokens in Claude, exact, measured 2026-10-25. With the Claude Code prefix mcp__…__ on each tool name: 1.5k. The o200k_base estimate is 872. Counted again when the tool definitions change. Method.
Repository
https://github.com/rbsoftwaresystems/draftlytic-mcp
Registry
active, updated 2026-07-08 · registry entry
Changes
2 recorded, reachable in 2 of them. A row is added when the result, the tool count or the cost changes.

Most expensive tools

The Claude column scales the o200k estimate of each tool by this server's ratio of exact to estimate, 1.64×.

Tool≈ Claude tokenso200k estimateShare of this server
render_prd38423527 %
validate_spec38123327 %
open_in_draftlytic33920724 %
spec_checklist32219723 %

Compare this server with others.

More servers

Other registry entries on npmjs.com, the ones next to this name; all of them.

Servers that mention structured or checklist.

History

We add a row when the result changes. A server with no change keeps its last row.

ProbedResultInitToolsClaudeo200k
2026-10-25 06:54alive262 ms41.4k872
2026-10-18 06:42alive237 ms4872

Badge for the README

mcpcost: alive

The result of the latest probe, the tool count and the token cost. The feed has an entry for every probe that changed them.

Atom feed

A mail when this server changes

Stops answering, comes back, tool set or cost changes. One confirmation mail first, a stop link in every mail.

For the publisher