io.github.prest/prest
pREST
Is the pREST MCP server down? Yes. It has given no valid answer since 2026-10-30: crashed on start.
Stdio MCP adapter bridging AI clients to pREST’s HTTP /_mcp endpoint for PostgreSQL APIs.
crashed on start down since 2026-10-30 · probed 2026-11-14 · unchanged since 2026-11-06
MCP error -32000: Connection closed prest-mcp: PREST_MCP_URL must be a valid http:// or https:// URL
- Run it
- docker run -i --rm ghcr.io/prest/prest-mcp-adapter:0.1.3 (stdio, probed in a container with the network off)
- Host
- ghcr.io
- Repository
- https://github.com/prest/prest-mcp-adapter
- Registry
- active, updated 2026-07-10 · registry entry
Compare this server with others.
More servers
Other registry entries on ghcr.io, the ones next to this name; all of them.
- io.github.praxec/cpm-planner · alive
- io.github.praxec/crossmatrix · alive
- io.github.praxec/fmeca · alive
- PremAgentic io.github.premagentic/premagentic · crashed on start
- Proxus Industrial MCP Server io.github.proxusiiotplatform/proxus-mcp · crashed on start
- makevideo io.github.random00000000/makevideo · alive
- Crossplane io.github.ravibagri5/crossplane-mcp-server · needs env
- LLM Eval Harness io.github.razilzul/llm-eval-harness · alive
Servers that mention prest.
- Izifete — prestataires événementiels en France fr.izifete/prestataires · alive
- Benefício de Prestação Continuada (BPC) io.github.mcp-dir/bpc-mcp · alive
- Cadastur: Prestadores io.github.mcp-dir/cadastur_prestadores-mcp · alive
- PrestaShop MCP Connector net.sarmate.studio/prestashop-connector · needs your URL
- Portal da Transparência: Benefício de Prestação Continuada - BPC io.github.mcp-dir/portal_transparencia_bpc-mcp · alive
- xyz.trusteed/mcp-gateway · not found
- Remnalis io.github.prestymdq/remnalis · alive
- BuildGets · Precios de obra y BC3 io.github.BuildGets/buildgets · alive
Badge for the README
The result of the latest probe, the tool count and the token cost. The feed has an entry for every probe that changed them.
A mail when this server changes
Stops answering, comes back, tool set or cost changes. One confirmation mail first, a stop link in every mail.
For the publisher
- No valid answer since 2026-10-30, in every probe since then.
- The process exited on start before it answered initialize. The error output is above.