mcpcost

io.github.jbobbink/glippy-mcp

glippy-geo

Is the io.github.jbobbink/glippy-mcp MCP server down? No. It answered initialize and tools/list in the probe of 2026-11-09.

GEO (Generative Engine Optimization) analysis: check any domain's AI-readiness for LLM search

alive probed 2026-11-14 · unchanged since 2026-11-09

11tools
11ktokens in Claude
5.7 %of Claude's 200k window
4.5×the median server
867 msto initialize
10 msto list tools
Run it
npx -y glippy-mcp@0.10.0 (stdio, probed in a container with the network off)
Host
npmjs.com
Reports itself as
glippy-geo 0.10.0
Capabilities
tools
Instructions
none
Of a 1M window
1.1 % of a 1M context window
Count
11k tokens in Claude, exact, measured 2026-10-25. With the Claude Code prefix mcp__…__ on each tool name: 11k. The o200k_base estimate is 7.0k. Counted again when the tool definitions change. Method.
Repository
https://github.com/jbobbink/glippy
Website
https://www.glippy.dev
Registry
active, updated 2026-11-08 · registry entry
Changes
2 recorded, reachable in 2 of them. A row is added when the result, the tool count or the cost changes.

Most expensive tools

The Claude column scales the o200k estimate of each tool by this server's ratio of exact to estimate, 1.62×.

Tool≈ Claude tokenso200k estimateShare of this server
extract_page_content1 8971 16817 %
analyze_domain1 7271 06315 %
analyze_urls1 7251 06215 %
compare_domains1 35683512 %
get_geo_summary1 0146249 %

Compare this server with others.

More servers

Other registry entries on npmjs.com, the ones next to this name; all of them.

Servers that mention optimization or generative.

History

We add a row when the result changes. A server with no change keeps its last row.

ProbedResultInitToolsClaudeo200k
2026-10-25 06:54alive1.2 s117.0k
2026-10-18 06:41alive867 ms103.9k

Badge for the README

mcpcost: alive

The result of the latest probe, the tool count and the token cost. The feed has an entry for every probe that changed them.

Atom feed

A mail when this server changes

Stops answering, comes back, tool set or cost changes. One confirmation mail first, a stop link in every mail.

For the publisher