mcpcost

io.github.AI-osho/godot-mcp-loop

Godot MCP Loop

Is the Godot MCP Loop MCP server down? No. It answered initialize and tools/list in the probe of 2026-11-04.

Drive a live Godot 4 editor: edit scenes and scripts, run and test the game, record GIFs.

alive probed 2026-11-14 · unchanged since 2026-11-04

41tools
19ktokens in Claude Opus 5.5
9.5 %of Claude's 200k window
7.5×the median server
493 msto initialize
20 msto list tools
Run it
npx -y godot-mcp-loop@0.9.0 (stdio, probed in a container with the network off)
Host
npmjs.com
Reports itself as
godot-mcp-loop 0.9.0
Capabilities
tools
Instructions
797 characters
Of a 1M window
1.9 % of a 1M context window
Count
19k tokens in Claude Opus 5.5, exact, measured 2026-11-04. With the Claude Code prefix mcp__…__ on each tool name: 20k. The o200k_base estimate is 11k. Counted again when the tool definitions change. Method.
Repository
https://github.com/AI-osho/godot-mcp-loop
Website
https://github.com/AI-osho/godot-mcp-loop
Registry
active, updated 2026-10-20 · registry entry
Changes
2 recorded, reachable in 2 of them. A row is added when the result, the tool count or the cost changes.

Most expensive tools

The Claude column scales the o200k estimate of each tool by this server's ratio of exact to estimate, 1.69×.

Tool≈ Claude tokenso200k estimateShare of this server
game_input4 0142 37621 %
scenario_run1 4368508 %
game_wait_for9075375 %
image_write8465014 %
node_add7314334 %

Compare this server with others.

More servers

Other registry entries on npmjs.com, the ones next to this name; all of them.

Servers that mention godot.

History

We add a row when the result changes. A server with no change keeps its last row.

ProbedResultInitToolsClaudeo200k
2026-11-04 08:03alive333 ms4119k11k
2026-10-21 06:39alive493 ms4111k

Badge for the README

mcpcost: alive

The result of the latest probe, the tool count and the token cost. The feed has an entry for every probe that changed them.

Atom feed

A mail when this server changes

Stops answering, comes back, tool set or cost changes. One confirmation mail first, a stop link in every mail.

For the publisher