dev.wirecat/gcal-cli
WireCat Google Calendar
Is the WireCat Google Calendar MCP server down? Yes. It has given no valid answer since 2026-11-02: crashed on start.
Your Google Calendar for agents: sync, search and change events. Sign in with the gcal CLI first.
crashed on start down since 2026-11-02 · probed 2026-11-14
MCP error -32000: Connection closed
{"error":{"code":"configuration_error","reason":"config.invalid","message":"no gcal profile on this computer yet — set one u- Run it
- npx -y @wirecat/gcal-cli@0.26.0 (stdio, probed in a container with the network off)
- Host
- npmjs.com
- Repository
- https://github.com/WireCatLabs/gcal-cli
- Website
- https://wirecat.dev/en/docs/gcal
- Registry
- active, updated 2026-11-14 · registry entry
Compare this server with others.
More servers
Other registry entries on npmjs.com, the ones next to this name; all of them.
- WireCat pbx dev.wirecat/asterisk-cli · crashed on start
- WireCat b24 dev.wirecat/bitrix24-cli · crashed on start
- WireCat Memo dev.wirecat/cli-memo · alive
- WireCat Google Drive dev.wirecat/drive-cli · crashed on start
- WireCat Mail dev.wirecat/mail-cli · crashed on start
- WireCat MAX dev.wirecat/max-cli · crashed on start
- WireCat Telegram dev.wirecat/tg-cli · crashed on start
- WireCat WhatsApp dev.wirecat/whatsapp-cli · crashed on start
Servers that mention gcal.
- com.leaveloadingcalculator/site · alive
- com.mfgcalcs/mfgcalcs · alive
- com.mintmcp/gcal · needs auth
- NestingCalc Calculators com.nestingcalc/calculators · alive
- Shipping Rates & Postage Calculator com.onlineshippingcalculator/shipping-rates · alive
- TradingCalc MCP: Options, Forex, Risk Stats, Prediction Markets, On-Chain & Crypto Futures io.github.SKalinin909/tradingcalc · alive
- TradingCalendars com.tradingcalendars/holidays · alive
- io.github.cronus42/ibc-mcp · alive
Badge for the README
The result of the latest probe, the tool count and the token cost. The feed has an entry for every probe that changed them.
A mail when this server changes
Stops answering, comes back, tool set or cost changes. One confirmation mail first, a stop link in every mail.
For the publisher
- No valid answer since 2026-11-02, in every probe since then.
- The process exited on start before it answered initialize. The error output is above.