mcpcost

com.tbmlib/mcp

TbmLib — Tenor & F-Attachment Trombone Slide Position & Overtones Engine

Is the TbmLib MCP server down? No. It answered initialize and tools/list in the probe of 2026-11-10.

Look up Tenor & F-attachment trombone slide positions (1st-7th), F-trigger & pitch adjustments.

alive probed 2026-11-15 · unchanged since 2026-11-10 · HTTP 200

4tools
704tokens in Claude Opus 5.5
0.4 %of Claude's 200k window
0.3×the median server
329 msto initialize
212 msto list tools
Endpoint
https://tbmlib.com/api/mcp (streamable-http)
Host
tbmlib.com
Protocol
2025-06-18
Reports itself as
com.tbmlib/mcp 1.0.0
Capabilities
tools
Instructions
none
Of a 1M window
<0.1 % of a 1M context window
Count
704 tokens in Claude Opus 5.5, exact, measured 2026-11-10. With the Claude Code prefix mcp__…__ on each tool name: 736. The o200k_base estimate is 400. Counted again when the tool definitions change. Method.
Repository
https://github.com/AbigailDavised/tbmlib-mcp
Website
https://tbmlib.com
Registry
active, updated 2026-11-10 · registry entry
Changes
2 recorded, reachable in 2 of them. A row is added when the result, the tool count or the cost changes.

Most expensive tools

The Claude column scales the o200k estimate of each tool by this server's ratio of exact to estimate, 1.76×.

Tool≈ Claude tokenso200k estimateShare of this server
compare_trombone_bore_and_mouthpieces21512231 %
lookup_trombone_slide_position18010226 %
analyze_trombone_overtone_intonation1589023 %
generate_trombone_legato_warmup1518622 %

Compare this server with others.

More servers

Servers that mention attachment or overtones.

History

We add a row when the result changes. A server with no change keeps its last row.

ProbedResultInitToolsClaudeo200k
2026-11-10 11:32alive152 ms4704400
2026-11-08 10:39alive329 ms1240143

Badge for the README

mcpcost: alive

The result of the latest probe, the tool count and the token cost. The feed has an entry for every probe that changed them.

Atom feed

A mail when this server changes

Stops answering, comes back, tool set or cost changes. One confirmation mail first, a stop link in every mail.

For the publisher

Fixed something? Probe it now, with the same steps as the daily run. This page updates with the next daily run.