mcpcost

com.acornharness/acorn

Acorn Harness

Is the Acorn Harness MCP server down? No. It answered initialize and tools/list in the probe of 2026-11-07.

Configure, price and order custom XT30, XT30(2+2) and XT30 + JST GH wire harnesses.

alive probed 2026-11-15 · unchanged since 2026-11-07 · HTTP 200

4tools
6.2ktokens in Claude Opus 5.5
3.1 %of Claude's 200k window
2.5×the median server
924 msto initialize
310 msto list tools
Endpoint
https://acornharness.com/mcp (streamable-http)
Host
acornharness.com
Protocol
2025-11-25
Reports itself as
acorn-harness 1.1.0
Capabilities
resources, tools
Instructions
2 246 characters
Of a 1M window
0.6 % of a 1M context window
Count
6.2k tokens in Claude Opus 5.5, exact, measured 2026-11-07. With the Claude Code prefix mcp__…__ on each tool name: 6.3k. The o200k_base estimate is 4.0k. Counted again when the tool definitions change. Method.
Repository
https://github.com/almond-bot/acorn-plugins
Website
https://acornharness.com/developers#ai
Registry
active, updated 2026-11-03 · registry entry
Changes
4 recorded, reachable in 4 of them. A row is added when the result, the tool count or the cost changes.

Most expensive tools

The Claude column scales the o200k estimate of each tool by this server's ratio of exact to estimate, 1.55×.

Tool≈ Claude tokenso200k estimateShare of this server
create_order2 9711 92048 %
quote_harness2 7641 78644 %
list_options2571664 %
get_order_status2481604 %

Compare this server with others.

More servers

Servers that mention acorn.

History

We add a row when the result changes. A server with no change keeps its last row.

ProbedResultInitToolsClaudeo200k
2026-11-07 10:20alive519 ms46.2k4.0k
2026-11-06 11:01alive591 ms45.9k3.8k
2026-11-05 11:04alive464 ms45.9k3.8k
2026-11-03 11:00alive924 ms45.6k3.6k

Badge for the README

mcpcost: alive

The result of the latest probe, the tool count and the token cost. The feed has an entry for every probe that changed them.

Atom feed

A mail when this server changes

Stops answering, comes back, tool set or cost changes. One confirmation mail first, a stop link in every mail.

For the publisher

Fixed something? Probe it now, with the same steps as the daily run. This page updates with the next daily run.